Answer :
Answer:
- Cost of Goods manufactured schedule consist of:
Direct material + Direct Labor + Factory overhead + Beginning WIP – Ending WIP
- Hence, Sections that are part of Schedule of Cost of Goods manufactured are:
- Direct Labor
- Direct Materials
- Factory Overhead
- Cost of Goods manufactured.
Explanation: