A construction crew has just built a new road. They built 15.36 kilometers of road in 6 weeks. At what rate did they build the road?

Answer :

divide total length by time:

15.36 / 6 = 2.56 km per week
Astute
We would do division by the amount they have built by how long it took them to built it.

[tex]\boxed{15.36\div6} = 2.56(km) \Leftarrow a \ week[/tex]

Your answer: [tex]\boxed{\boxed{\bf{2.56(km) \Leftarrow (per \ week)}}}[/tex]

Other Questions